Pool remodeling is an important process that should be done by a professional contractor. Pools usually need to be remodeled for different reasons such as upgrading its design to a modern one. Also, a structure whose structural integrity has deteriorated due to age, earthquakes, or human activity may need to be remodeled to make it safe for use. The process of renovating the structure is composed of several steps and activities. When in need of the best pool repair Gilbert should be visited.

The first step in the remodeling process is draining the pool since work cannot be done on it while it is still filled with water. It is therefore a must that water be pumped out. This is done using a submergible pump which is dropped in the structure in order to pump water out. The entire process may take a lot of time depending on the size of the pump being used and the size of the structure.

During the process, all pieces of equipment connected to the pool have to be turned off. Once all the water is driven out, the preparation stage commences. In this stage, every damaged surface materials are removed totally. This process is normally very noisy and dusty. It is recommended that any furniture located on the patio be removed. Any pots, plants and other items around the pool also have to be taken away.

After the surface has been well prepared as desired, it is time for applying tiles, coping, and other materials meant to achieve decoration. The choice regarding the kind of types to be used is made by the client. Prior to doing masonry and tiling, production of a clear documentation of the condition of the pool and its environment is done. It is at this juncture that any design ideas that the client may desire are integrated into the remodeling project.

The application of tile and masonry is usually the more involving. It takes between one and three days depending on the number of workers the company sends over for the job. The size of the pool will also determine the length of time it takes. After this stage, it is time to apply sealant to ensure that plumbing is waterproof.

Upon completion of sealing, the material covering the surface of the pools is installed. At this point, the application of pool surface material is done. A number of finishing materials can be employed in this process. Such materials include hydrazzo, pebbles, quartz and beadcrete. Some of these materials are artificial while others are natural.

The step of washing the structure with acid is optional and its necessity depends on the finish material used. This makes part of the cleanup process, after which general cleaning of the surrounding areas and the structure is done. This is purposefully done to restore everything to how it was prior to the start of the project.

Once the cleaning process is complete, the contractor will fill the structure with water. The water is filled to the highest level possible. Usually, leakages are also tested as a standard practice. Surface curing and water treatment among other processes mark the conclusion of the project.