The Steps Swimming Pool Contractors Oklahoma City Follow In Construction

By Marci Glover


Swimming is an activity that people partake in for fun or sport. It has been enjoyed for many years. Long ago, people would swim in natural water sources such as rivers, lakes and oceans. With advances in construction knowledge and skill, swimming pools were made. Swimming pool contractors oklahoma city construct the ponds in different sizes and styles. The construction process is done in several steps.

When a client wants a pool in their residential area, they first have a meeting with the construction experts. The meeting involves collection of ideas from the client on the type of pool that they would like. The customer explains the shape he wants as well as size. Other variables such as colour are also agreed upon. The experts can accompany the client to the site so as to evaluate it. They can also advice the client on designs that will blend well with the compound and house.

A cost analysis is done for both the materials as well as labour to be used. The time needed to implement the project is also estimated. Duration needed is determined by the amount of work to be done. The work load is more if the design is complex and the size big. If there are structures that are on or near the construction site, the owner is advised to move them to a safe place. For those which can not be moved, the owner is informed that they may be destroyed during construction.

Digging is done either manually or using machines. Use of machines is faster than manual digging. Both methods may be used. Manual digging is good for achieving smooth curves and sharp corners. The soil obtained can be used to modify the landscape or plant potted flowers. A metallic mesh is assembled on the walls and floor or the pond. It helps to hold concrete together which increases its strength.

Pipes which will be supplying water to the pool are put in place. Those that will drain the water are also installed. They are secured to the mess and the open ends are closed so that they do not fill with concrete.

Concrete is used in construction of the walls and floor of the pond. It is poured into the mesh and allowed to settle into all the spaces in the mesh. Adequate time is then allowed for it to dry and bond well. When it dries, it is of high strength and does not crack easily.

Once the concrete is set, tiles are cemented to the walls and floor. They give the surfaces a smooth feel as well as better look. The decks are also worked on to blend with the ground around the pond. The water pumping systems are connected to the plumbing systems in the pond.

These are the key steps followed in construction. Minor or major adjustments are made depending on the complexity of the design and size chosen. Upon completion of the pond. It is handed over to the owner. It should undergo regular maintenance so as to give long service.




About the Author:



0 comments: